Subscribe Now Subscribe Today
Science Alert
 
Blue
   
Curve Top
Journal of Applied Sciences
  Year: 2008 | Volume: 8 | Issue: 18 | Page No.: 3221-3227
DOI: 10.3923/jas.2008.3221.3227
 
Facebook Twitter Digg Reddit Linkedin StumbleUpon E-mail

Designing a Control Mechanism for Production Planning Problems by Means of Earned Value Analysis

Siamak Noori, Morteza Bagherpour and Farbod Zorriasatine

Abstract:
In this study, a Production Planning Problem (PPP) known as Multi Product Multi Period (MPMP) where the operation sequence is known is described. It is also shown how a mechanism for controlling MPMP can be created by applying Earned Value Analysis (EVA). This mechanism which has not been reported in the literature enables the control of production status and consequently forecasting of the required time and cost for completely fulfilling customer`s demand during a manufacturing process. Thus, it is shown that PPP can be integrated with powerful project control tools such as EVA.
PDF Fulltext XML References Citation Report Citation
How to cite this article:

Siamak Noori, Morteza Bagherpour and Farbod Zorriasatine, 2008. Designing a Control Mechanism for Production Planning Problems by Means of Earned Value Analysis. Journal of Applied Sciences, 8: 3221-3227.

DOI: 10.3923/jas.2008.3221.3227

URL: https://scialert.net/abstract/?doi=jas.2008.3221.3227

COMMENT ON THIS PAPER
 
 
 

 

 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 

Curve Bottom