  1. Information Technology Journal
  2. Vol 11 (4), 2012
  3. 484-487
  • Issues
    Online First Current Issue All Issues
  • Information About
    Aims and Scope Editorial Board Guide to Authors Article Processing Charges
    Submit a Manuscript

Information Technology Journal

Year: 2012 | Volume: 11 | Issue: 4 | Page No.: 484-487
DOI: 10.3923/itj.2012.484.487
crossmark

Facebook Twitter Reddit Linkedin E-mail
Research Article

Fuzzy Comprehensive Evaluation on the Selection of Material Management Project Partner

Lv Pu
School of Management, Dalian Jiaotong University, Dalian 116028, China

Zheng Fanfan
School of Management, Dalian Jiaotong University, Dalian 116028, China

ABSTRACT


This study introduces a kind of fuzzy comprehensive evaluation method and combined with AHP, puts forward a comprehensive evaluation model for the selection of material management project partner. On that basis, the study utilizes this model in a practical case and verifies the effectiveness of this mode in evaluation of material management project partner.
PDF Abstract XML References Citation

Keywords


  • fuzzy comprehensive evaluation
  • Material management
  • partner

Article History

Received: October 28, 2011;   Accepted: October 31, 2011;   Published: January 20, 2012

How to cite this article

Lv Pu and Zheng Fanfan, 2012. Fuzzy Comprehensive Evaluation on the Selection of Material Management Project Partner. Information Technology Journal, 11: 484-487.

DOI: 10.3923/itj.2012.484.487

URL: https://scialert.net/abstract/?doi=itj.2012.484.487

INTRODUCTION


Generally, a large material management project is often offered by a stronger supplier as the general contractor. Then the general contractor organizes itself and some other subcontractors, who are weak in overall strength but are specialized in their own fields, so as to complete the whole project cooperatively (Jie-He, 2003). Thus, for a general contractor, to select suitable project partners, subcontractors, becomes crucial. Before selection, it is necessary to make a scientific comprehensive evaluation to all the partners. But the influencing factors of material management project partners evaluation are multitudinous, involved in both quantitative indexes and qualitative indexes. Even quantitative indexes are due to a variety of subjective and objective reasons can't get the concrete numerical value of index. And there are many indicators of evident fuzziness, no clear criteria. This leads to the project partner evaluation index of fuzziness, uncertainty and difficult to measure. In view of the above reasons, this study tries to use a method of fuzzy comprehensive evaluation which based on the fuzzy mathematical theory for evaluation on the material management project partner selection.

EVALUATION PROCESS

The evaluation process includes: Establishing fuzzy evaluation sets, sure comments level domain, determine evaluation membership matrix, determines the index weight, comprehensive evaluation, result analysis, etc (Crainic et al., 2009).

Establish fuzzy evaluation set: According to the existing evaluation index system, construct a fuzzy evaluation set, U={u1,u2,u3,…,ui},ui means the ist primary index. And in ui={ui1,ui2,…,uij}, uij means the jst secondary index in the ist primary index.

Make sure comments level domain: Before fuzzy comprehensive evaluation, comments level should be determined. In setting the comments level, the grad of levels usually take the odd number which less than 9 larger than 4. Too many comments levels would make it difficult to determine the discriminatory power of semantic level of economic benefit belongs. On the other hand, too little comments level grads can not meet the quality requirements of fuzzy comprehensive evaluation. And odd number grades will have a middle class, facilitate judgment on partner level.

Make sure evaluation membership matrix: After setting comments grade, the membership rate for enterprise to each index can be judged. Membership rate means the degree of one index belongs to a comment level (Zhong-Bao, 2008). We can use the number of people who choice certain comment level to show it. Under the same level of all the indexes of membership in comments level, it got a fuzzy relation matrix. Select a certain number of experts to constitute the jury, Evaluate factors of the second layer in the evaluation index system. We choice the questionnaire survey and analyze the result to get single-factor fuzzy judgment matrix.

Image for - Fuzzy Comprehensive Evaluation on the Selection of Material Management Project Partner
(1)

In the formula, i mean the number of index in first class index; m is the number of target factors concentrated elements; n is the number of evaluation concentration elements.

Make sure the index weight: In comprehensive evaluation system of material management project partner selection, various factors important degree is not the same, so it is necessary to distribute their weights. In order to overcome the weight coefficient method to determine the indicated existing scientific sent, subjectivity big defects, this study used the Analytic Hierarchy Process (AHP) established the mathematical model for solving the weight of each factor (Yan and Wen-Sheng, 2009). Specific operation process is as follows:

First, determine the evaluation factors judgment matrix. Compare partner comprehensive evaluation factors system factors and child factors and their judgment matrixes can be obtained respectively. For example, binary comparison on factor or child factors, get this matrix:

Image for - Fuzzy Comprehensive Evaluation on the Selection of Material Management Project Partner
(2)

This matrix is the judgment matrix of factors or child factors. In the matrix, aij is listed element and did the value of the elements compare. Its value standard is: Important degree equal value is 1, slightly important is 3, obviously important for 5, very important for 7, extremely important for 9, between two adjacent degrees, respectively 2,4,6,8. Conversely compared, the numbers are the reciprocals of above; those are 1-1/9.

Second, calculating the maximum eigenvalue of judgment matrix and the eigenvectors W of λmax. Normalization of W for later, the value of the corresponding, Wi is representative of the evaluation factors weights or comments relative to a son factors weights of evaluation factors. This can work out management ability U1, employee ability U2, production capacity of U3, financial cost U4 factors under the weight and their weight.

Third, validate the consistency. Consistency index CR = IC/IR, type: IC (λmax-n)/(n-1) (n is for the evaluation factors in number or the number of child factors), IR is the relevant index n order number. If CR <0.10 judgment matrix is satisfactory consistency, or need to adjust judgment matrix.

Fuzzy comprehensive evaluation: By weight vectors and fuzzy relation matrix, make the following comprehensive evaluation:

Image for - Fuzzy Comprehensive Evaluation on the Selection of Material Management Project Partner
(3)

Image for - Fuzzy Comprehensive Evaluation on the Selection of Material Management Project Partner
(4)

Image for - Fuzzy Comprehensive Evaluation on the Selection of Material Management Project Partner
(5)

In the formula, is the comprehensive evaluation value of subgoal; B is the comprehensive evaluation value of final goal. Mark “°” said the synthesis operations, generalized. Select a specific computational operation according to the actual situation.

APPLICATION EXAMPLE

Background information: ZSD-XA is a large material circulation enterprises in our country electric power industry, is one of the main supply channels in China's hydropower and thermal power production and construction. In its partner selection of one project (we called project A), ZSD-XA has to choose one from these three companies. Here we call them partner SV, partner DK and partner DF. In these three companies, SV’s strength is strong. Now their subsidiaries have branches all over the country. They use advanced materials management information system based on Internet, can integrate storage, transportation, distribution various aspects resources. In the eastern and southern China, they have strong transportation and business network but have no experience on cooperation with construction enterprise. Partner DK long-term bear ZSD-XA in Shanxi area material management programs and they kept the good cooperation relations. DK and ZSD-XA have deeper cooperation relationship, the trust mechanism and customer relations have been better but they don’t have advanced information system. Partner DF is a material management company founding not too long. The company has strong financial strength, staff quality level is high but compare to the above two companies, the experience is smaller. So, how to choose a better one? This is a question to ZSD–XA’s company leadership group.

Comprehensive evaluation of ZSD-XA’s material management project partners: First identify the evaluation index system of material management project partner. Space constraints permit longer write index system construction process. Then determine the index weight, as stated above, use AHP method (Cao and Gao, 2005). According to the characteristic of material management project partners, the evaluation index system and index weight shown in Table 1.

This study make a questionnaire survey to partner SV, DK and DF and make a single factor simulation evaluate aim at the secondary indexes according to Table 1.We select the ZSD-XA company A project team and material management relevant persons as respondents. Comments are divided into five rating. Accordingly, comments sets V={v1,v2,v3,v4,v5}, v1 says very satisfied, v2 satisfied, v3 general, v4 says not quiet satisfied, v5 says not satisfied. Different comment level can reflect different satisfactory level. Through questionnaires recovery, sorting and counting, we can the single-factor fuzzy judgment membership list of partner SV. The list shows in Table 2.

According to index weights in Table 1, we can calculation comprehensive evaluation score.

From formula (3) and W1=( 0.493,0.507), we can get the evaluation vector of team building ability:

B1 = W1*R1 = (0.249, 0.449, 0.302, 0, 0)


In the same way, ability of team building:

B2 = W2*R2 = (0.460, 0.250, 0.290, 0, 0)

• Ability of Project plan: B3=W3*R3= (0.360, 0.250, 0.290, 0, 0)
• Ability of Project control: B4=W4*R4=( 0.484, 0.308, 0.139, 0.068, 0)
• Quality level of project: B5=W5*R5=( 0.401, 0.266, 0.100, 0.233, 0)
• Stakeholder satisfaction level: B6=W6*R6=( 0.289, 0.406, 0.213, 0.092, 0)
• High-level support level: B7=W7*R7=( 0.414, 0.236, 0.235, 0.115, 0)

According to formula (5), we can get comprehensive evaluation vector:

B = W*R = ( 0.373, 0.335, 0.234, 0.058, 0.000)

Because of:

Image for - Fuzzy Comprehensive Evaluation on the Selection of Material Management Project Partner

it isn’t necessary to normalize.

Table 1: Evaluation indexes weights of ZSD-XA material management project partner
Image for - Fuzzy Comprehensive Evaluation on the Selection of Material Management Project Partner

Table 2: Partners SV single-factor fuzzy judgment membership
Image for - Fuzzy Comprehensive Evaluation on the Selection of Material Management Project Partner

In order to facilitate comparison results, the judge set V, respectively corresponding score v1 = 90, v2 and v3 = = 80 v4 = 60, 70, v5 = 50, so comprehensive score for:

VI = B*VT = (0.373, 0.335, 0.234, 0.058, 0.000)* (90, 80, 70, 60, 50)T = 80.228

From the result we can see the partner SV between very satisfied and satisfaction. In the same way, composite scores for partners DK is VII=76.346 and composite scores for partners DF is V?=75.062.

See from this, the evaluation of partner SV is better than partner DF and DK. So in further cooperate, should first consideration partners SV as A project partners.

CONCLUSION


This study has introduced the fuzzy comprehension evaluation method based on fuzzy comprehensive evaluation and its analysis process. Taking the evaluation of ZSD-XA material management as an example, the study carried out the practical application of this method. Has verified the effectiveness of fuzzy comprehension evaluation in the partner selection issue with qualitative factors which difficult to quantify.

REFERENCES


  1. Jie-He, C., 2003. Logistics. Peking University Press, Beijing, pp: 83-104.

  2. Crainic, T.G., N. Ricciardi and G. Storchi, 2009. Models for evaluating and planning city logistics systems. Transport. Sci., 43: 432-454.
    CrossRef

  3. Zhong-Bao, Q., 2008. An evaluation method based on fuzzy mathematics-fuzzy comprehensive evaluation method. China Bidding, 4: 14-25.

  4. Yan, Y. and H. Wen-Sheng, 2009. A selection model on supply chain partner based on AHP and Fuzzy comprehensive evaluation. China Manage. Inform., 8: 80-82.

  5. Cao, J.M. and X. Gao, 2005. Fuzzy syntheses evaluation of supply chain partners of real estate. J. Tongji Univ., 33: 843-847.

Leave a Comment


Your email address will not be published. Required fields are marked *

Useful Links

  • Journals
  • For Authors
  • For Referees
  • For Librarian
  • For Socities

Contact Us

Office Number 1128,
Tamani Arts Building,
Business Bay,
Deira, Dubai, UAE

Phone: +971 507 888 742
Email: [email protected]

About Science Alert

Science Alert is a technology platform and service provider for scholarly publishers, helping them to publish and distribute their content online. We provide a range of services, including hosting, design, and digital marketing, as well as analytics and other tools to help publishers understand their audience and optimize their content. Science Alert works with a wide variety of publishers, including academic societies, universities, and commercial publishers.

Follow Us
© Copyright Science Alert. All Rights Reserved