Citation to this article as recorded by
Optimization of coiled tubing nozzle for sand removal from
wellbore Journal of Petroleum Exploration and Production Technology |
Determining the difference of kick tolerance with single bubble and dynamic multiphase models: Evaluation of well-control with water/synthetic based muds Ain Shams Engineering Journal Vol. 13, Issue 4, 101678, 2022 |
Application of Foam Assisted water-alternating-gas flooding and quantification of resistivity and water saturation by experiment and simulation to determine Foam propagation in sandstone Heliyon |
Effects of dietary basil (Ocimum basilicum) supplementation on reproductive hormones, semen parameters, and testicular development in Zandi male lambs Veterinary and Animal Science |
The Effect of Inclination on the Stability of Foam Systems in Drilling and Well Operations SPE Drilling & Completion Vol. 36, Issue 02, 263, 2021 |
Hydraulic Fracture Conductivity in Shale Reservoirs Hydraulic Fracturing [Working Title] |
How to cite this article
William K. Pao and Javed A. Khan, 2014. Horizontal Well Cleanup Operation Using Foam in Different Coiled Tubing/Annulus Diameter Ratios. Journal of Applied Sciences, 14: 3235-3241.
DOI: 10.3923/jas.2014.3235.3241
URL: https://scialert.net/abstract/?doi=jas.2014.3235.3241
DOI: 10.3923/jas.2014.3235.3241
URL: https://scialert.net/abstract/?doi=jas.2014.3235.3241