Information Technology Journal1812-56381812-5646Asian Network for Scientific Information10.3923/itj.2012.1310.1315DuXuedong LiGuilin JiJiangtao TanXiaomei 92012119Based on the scheduling problem of the high-speed train, this study introduces a real-time scheduling model. Combining with the dynamic behavior controlling of train, the feedback of the optimal speed and the algorithm optimization of the real-time scheduling, the feasibility of the model is studied at the end, this study gives the real-time application analysis of high-speed train scheduling system.]]>Huaping, S., J. Limin and Q. Zheng,2004255661Huashen, W. and W. Junfeng,200931107110Zhou, Y.H., P. Wang, P. Wu and Y.P. Wang,201137288290Honggang, W., Z. Yijun, Z. Qi, W. Jianying and W. Zhuangfeng,200526107111Yong-jun, C. and Z. Lei-shan,20083015Alhassan, H.M. and J. Ben-Edigbe,20111121932199Xuedong, D. and M. Yin,20113140145Xuedong, D., S. Rui and G. Ziyou,20111017611766Lo, S.K.C. and H.C. Keh,20111011131125Fen-Ling, F. and L. Dan,201211126133Sasikala, T. and S.K. Srivatsa,20065923929Viswacheda, D.V., L. Barukang, M.Y. Hamid and M.S. Arifianto,2007721112119Salem, M., M. Ismail and N. Misran,201111336341Limin, J., Z. Jianhau and Z. Xidi,19961795100Ayanzadeh, R., E. Shahamatnia and S. Setayeshi,2009928472851Baklizi, M., H. Abdel-Jaber, S. Ramadass, N. Abdullah and M. Anbar,201211255261