Citations in impact factor journals
The third comprehensive survey on scheduling problems with setup
times/costs European Journal of Operational Research Vol. 246, Issue 2, 345, 2015 |
How to cite this article
Ming- Cheng Lo, Jen- Shiang Chen and Yong- Fu Chang, 2008. Two-Machine Flexible Flow-Shop Scheduling with Setup Times. Journal of Applied Sciences, 8: 2217-2225.
DOI: 10.3923/jas.2008.2217.2225
URL: https://scialert.net/abstract/?doi=jas.2008.2217.2225
DOI: 10.3923/jas.2008.2217.2225
URL: https://scialert.net/abstract/?doi=jas.2008.2217.2225