HOME JOURNALS CONTACT

Journal of Applied Sciences

Year: 2013 | Volume: 13 | Issue: 22 | Page No.: 5287-5297
DOI: 10.3923/jas.2013.5287.5297
Kinematic and Dynamic Analysis of Clamping Manipulator for Drill Pipe Racking System
Zhi-Chao Yan, Li-Quan Wang and Hai-Xia Gong

Abstract: The clamping manipulator of automatic drill pipes racking system of offshore drilling platform was designed in this dissertation. This kind of manipulator totally meets the design requirements of lightness, large load, extensive service, simple and reliable structure and high efficient, etc, Comparing with other clamping manipulator of drill pipe racking systems, each sub manipulator equipped with just only one drive part can exactly meet the work demands, as greatly simplifies the mechanical structure and improves the working reliability. In this dissertation, the kinematical equation of manipulator by using the closed vector graph method was built , the kinematics simulation was realized based on ADAMS software and the result has verified the validity of the manipulator design. By comparison of the dynamics equation of manipulator by the method of traditional equivalent mechanical model and the dynamics simulation based on ADAMS software, Some variable curves of mechanical components of manipulator, which were closer to reality, were got for the convenience of the design of control system later.

Fulltext PDF

How to cite this article
Zhi-Chao Yan, Li-Quan Wang and Hai-Xia Gong, 2013. Kinematic and Dynamic Analysis of Clamping Manipulator for Drill Pipe Racking System. Journal of Applied Sciences, 13: 5287-5297.

Keywords: Pipe racking, clamping manipulator, kinematics simulation and dynamics simulation

REFERENCES

  • Cui, X.Z., W.Q. Liu, W.S. Xiao, F.Q. Zhang and L. Dong, 2010. Design for column pipe racking device of offshore drilling platform. J. Oil Field Equipment, 39: 45-49.


  • Ward, D.H., J.S. Thale, J. Tomashek, J.A. Howard and L.B. Sheldon, 1976. A computer controlled system for automated racking of pipe on drilling vessels. Proceedings of the Offshore Technology Conference, May 5-8, 1975, Houston, Texas, pp: 54-60.


  • Jiang, M., Y. Cao and S. Zhou, 2008. A lightweight mast-style land drilling rig well pipe handling equipment. China Petroleum Machinery, 36: 90-91.


  • Rohde, K., T. Berg, T. Yost and S.O. Aanesland, 2010. Fully automatic pipehandling systems on a 6th-generation drilling vessel. Proceedings of the IADC/SPE Drilling Conference and Exhibition, February 2-4, 2010, New Orleans, Louisiana, USA -.


  • Li, F.P., G.J. Yang, M.Y. Shi, Y.A. Wang and X.S. Gao, 2011. Driving device project designing of offshore rig pipe racking system. Oil Field Equip., 40: 48-50.
    Direct Link    


  • Liu, W.Q., X.Z. Cui and F.Q. Zhang, 2007. Development and typical structure of pipe racking system. J. Oil Field Equipment, 36: 74-77.


  • Tong, Z., L.C. Zheng, H.F. Niu, X.Q. Gao, X.Z. Wang and A.Q. Ding, 2011. The design of the pipe racking system for land rig. China Petroleum Machinery, 39: 27-29.


  • Zhang, H.S., F. Yang, L.L. Yao and B. Shao, 2011. Land drill rig mast automatic drainage system. Machinery, 50: 43-44.

  • © Science Alert. All Rights Reserved