Case-based Study Method for Risk Assessment in EPC Project
Huaiping Feng, Jianmei Chang and Zhipeng Wang

Abstract: In recent years, with the need of acting on international convention and the development of the enterprises themselves, EPC contract mode gets a wide range of applications. Compared with the traditional contracting mode, contractors take most of risk in EPC projects. It is more important for the contractors to make risk assessment in EPC project. Among some risk assessment methods, such as AHP and fuzzy evaluation method, the data is based on expert review. The results are of subjectivity. In this study a new method and procedure was put forward, in which the data is based on the study of similar or related cases and optimized. This method made the quantitative analysis of risk assessment more accurate and objective. The model was tested by example using 5 case studies with good results. The example showed that this method of quantitative analysis was effective in EPC contract projects risk assessment for contractors, which provided a basis for contractors to make decision.

Fulltext PDF

How to cite this article
Huaiping Feng, Jianmei Chang and Zhipeng Wang, 2013. Case-based Study Method for Risk Assessment in EPC Project. Journal of Applied Sciences, 13: 2351-2354.

Keywords: EPC, case-based study, risk assessment and weighs optimize

REFERENCES

  • Benitez, J., X. Delgado-Galvan, J. Izquierdo, R. Perez-Garcia, 2012. An approach to AHP decision in a dynamic context. Decision Support Syst., 53: 499-506.
    CrossRef    Direct Link    


  • Raftery, J., 1994. Risk Analysis in Project Management. 2nd Edn., E & FN Spon Press, Padstow, UK., ISBN-13: 9780419184201, Pages: 143
    Direct Link    


  • Green, S.D., 2001. Towards an integrated script for risk and value management. Project Manage., 7: 52-58.

  • © Science Alert. All Rights Reserved