According to the Hefei subway deep foundation pit engineering,
this study expounds the pile-anchor supporting scheme of prestressed anchor
cable layout optimization. Combined with the actual situation of engineering,
numerical simulation was carryed out by using FLAC3D software. The four different
layout of prestressed anchor cable is used for simulation analysis, Detailed
to carry out the horizontal displacement of the pile and anchor axial force
analysis, discuss the anchor cable layout optimization. Calculation results
provide a reference for support scheme of similar large deep foundation pit.
How to cite this article
Donglin Wang, Jian Liang, Yusheng Jia and Xin Guo, 2013. Optimization of Combined Pile-anchor Supporting Schemes for Deep Foundation
Pit. Information Technology Journal, 12: 3034-3037.
REFERENCES
He, S.M., X.G. Zhang and C.H. Wang, 2004. Study on mechanism of prestressed anchoring cable based on modified shear lag model. Chinese J. Rock Mech. Eng., 23: 2562-2567.
Direct Link
Xiong, Z.B., X.F. Liu, Q.Y. Wang and D.P. Gu, 2009. Inspection and monitoring analysis for anchor rope of pile-anchor retaining structure in deep foundation pit. J. Min. Metallurgical Eng., 29: 8-15.
Direct Link
Yang, Y.H., X. Ma and Y.Q. Zhou, 2006. Field measurements and theoretical analysis on internal force of composite soil-nailing at Zhongshiyou foundation pit. J. Geotech. Eng. Technique, 20: 9-12.
Zhang, S.X. and S.F. Fan, 2006. Back analysis and numerical simulation of earth pressure around pile-anchor supporting structures in deep pit. J. Rock Soil Eng., 28: 122-126.
Zhang, Q.X., D.K. Tong, Z.X. Xiong and L.J. Guo, 2006. Measurement and analysis on the stress in retaining pile and the force of anchor at a deep excavation of YA-AO building. J. Beijing Univ. Technol. Sci., 32: 76-82.
Direct Link
© Science Alert. All Rights Reserved