|
|
|
|
Research Article
|
|
Functional Evaluation of Chinese High-speed Railway Station |
|
Yang Wang,
Fan Wang,
Li-Juan Wang
and
Tian-Wei Zhang
|
|
|
ABSTRACT
|
Function orientation plays a very important role in the design
of a high-speed railway station. The functions include the passing function,
transfer function and commercial function. The qualitative and quantitative
analysis methods were used in analyzing the function. According to the high-speed
trains features of high density,
less regulation capacity and high punctuality, the numbers of the time for waiting
for trains departure and for
gathering passengers were calculated after some parameters were given, the two
numbers are decreased, respectively, to 49.1 and 53.2% of the conventional railway
passenger station, the passing function should be included in the design of
the high-speed railway passenger station. Considering that it is unable to provide
a door to door service, a high-speed railway station is often connected by two
or more lines and a railway hub with several stations. Thus it is necessary
for high-speed railway stations to have convenient and rapid transfer function
with other traffic modes, as well as interior transfer in station and railway
hubs. The business function improves the revenue and the service standard. Enough
spaces for commercial development should be designed to make full use of the
superiority of attracting people, commodities and information. Some practical
problems should be solved to achieve the three functions.
|
|
|
|
|
|
|
|
REFERENCES |
1: Couto, A. and D.J. Graham, 2008. The impact of high-speed technology on railway demand. Transportation, 35: 111-128. CrossRef | Direct Link |
2: Brons, M., M. Givoni and P. Rietveld, 2009. Access journey to railway stations and its potential in increasing rail use. Transportation Res. Part A: Policy Practice, 43: 136-149. CrossRef | Direct Link |
3: Givoni, M. and P. Rietveld, 2007. The access journey to the railway station and its role in passengers satisfaction with rail travel. Transp. Policy, 14: 357-365. CrossRef | Direct Link |
4: Hsu, S.C., 2010. Determinants of passenger transfer waiting time at multi-modal connecting stations. Transportation Res. Part E: Logistics Transportation Rev., 46: 404-413. CrossRef | Direct Link |
5: Liebchen, C., 2008. The first optimized railway timetable in practice. Transportation Sci., 42: 420-435. CrossRef | Direct Link |
6: Lin, D.M. and J. Liu, 2012. Research on train timetable-based railway route planning problem. Adv. Inform. Sci. Ser. Sci., 4: 71-79.
7: Ma, W.W., X.Y. Liu and L.Q. Li, 2009. Research of waiting time of passengers at railway stations. J. China Railway Soc., 31: 104-107.
8: Shi, F., Z. Zhou, J. Yao and H. Huang, 2012. Incorporating transfer reliability into equilibrium analysis of railway passenger flow. Eur. J. Operational Res., 220: 378-385. CrossRef | Direct Link |
9: Yao, J.L., Z.W. Wu and Z.X. Yang, 2009. The influence of urban traffic reliability to railway passenger station maximum assembling passengers. J. Railway Sci. Eng., 6: 84-88. Direct Link |
10: Zhang, J.N. and P. Zhao, 2012. Research on spatial affected areas of central cities based on generalized-distance. Adv. Inform. Sci. Ser. Sci., 4: 168-176.
11: Rong, Z. and D. Bouf, 2005. How can competition be introduced into Chinese railways? Transportation Policy, 12: 345-352. CrossRef | Direct Link |
12: Zhang, T.W., 2009. Research on the assembling rule of passengers at railway passenger stations. J. China Railway Soc., 31: 31-34.
13: Zhang, T.W., G.F. Gao, Y.P. Luo and L. Nie, 2011. Calculation model of maximum number for gathering passenger at railway passenger station. J. Traffic Transportation Eng., 11: 79-83. Direct Link |
14: Zheng, J., Z.W. Shen and S.F. Cai, 2009. Theoretical Exploration of Chinese Contemporary Railway Passenger Station Design. China Communication Press, Beijing, Chnia, pp: 26-37
|
|
|
 |