Subscribe Now Subscribe Today
Research Article
 

DCT Workshop Production Process Evaluation Based on Analytic Hierarchy Process



Daofang Chang, Youfang Huang, Yu Wang and Yishi Zhu
 
Facebook Twitter Digg Reddit Linkedin StumbleUpon E-mail
ABSTRACT

This article through to a Dual Clutch Automatic Transmission (DCT), the existing workshop production situation analysis, find out the bottleneck and conflict of the existing workshop process. The production process by using analytic hierarchy process production process evaluation index and index weight and carrying out optimization analysis based on the existing resources. Finally, it will conclude that the optimized scheme for DCT plant process system of the production process have the effect of improvement and can be applied to different scale of production later.

Services
Related Articles in ASCI
Similar Articles in this Journal
Search in Google Scholar
View Citation
Report Citation

 
  How to cite this article:

Daofang Chang, Youfang Huang, Yu Wang and Yishi Zhu, 2013. DCT Workshop Production Process Evaluation Based on Analytic Hierarchy Process. Journal of Applied Sciences, 13: 2182-2188.

DOI: 10.3923/jas.2013.2182.2188

URL: https://scialert.net/abstract/?doi=jas.2013.2182.2188
 

REFERENCES
Azadeh, A., M. Haghnevis and Y. Khodadadegan, 2009. An improved model for production systems with mixed queuing priorities: An integrated simulation, AHP and Value Engineering approach. Int. J. Ind. Syst. Engine., 4: 536-553.
CrossRef  |  Direct Link  |  

Gan, L., X. Wang and R. Li, 2009. Research and implementation of AHP-based method base: Model base application of hierarchical model. Proceedings of the Pacific-Asia Conference on Knowledge Engineering and Software Engineering, December 19-20, 2009, Shenzhen, China, pp: 107-110.

Kulkarni, M., T. Shim and Y. Zhang, 2007. Shift dynamics and control of dual-clutch transmissions. Mech. Mach. Theory, 42: 168-182.
CrossRef  |  Direct Link  |  

Panwalkar, S.S. and W. Iskander, 1977. A survey of scheduling rules. Operat. Res., 25: 45-61.
CrossRef  |  Direct Link  |  

Wang, Y.Y., J.W. Du, H.C. Wang and F. Shi, 2008. Simulation of engine and control system based on GT-power and Simulink. J. Syst. Simulat., 20: 4379-4381.

Warfield, J.N., 1999. Twenty laws of complexity: Science applicable in organizations. Syst. Res. Behav. Sci., 16: 3-40.
CrossRef  |  Direct Link  |  

Zhang, Y., X. Chen, X. Zhang, H. Jiang and W. Tobler, 2005. Dynamic modeling and simulation of a dual-clutch automated lay shaft transmission. J. Mech. Des., 127: 302-307.
CrossRef  |  Direct Link  |  

Zhang, Y.L., F. Gao, F.R. Du and L.Y. Xiao, 2008. Hardware-in-the-loop simulation of vehicle starting control method based on displace. J. Syst. Simulat., 20: 2722-2725.

©  2020 Science Alert. All Rights Reserved