Research Article
Optimal Placement of PMUs for Power System Observability Using Topology Based Formulated Algorithms
Faculty of Electrical Engineering, Sahrif University of Technology, P.O. Box 11365-8639, Azadi Avenue, Tehran, Iran
Observability of power system is a necessary condition for state estimation. State estimation provides estimation for all metered and unmetered electrical quantities of the power system. Its output is used for online operation and management of power system. Power system observability analysis reveals if the present set of measurements and their distribution are sufficient to solve the current state of the power system. Traditional state estimators use Weighted Least Squares (WLS) method to solve system state estimation problem with conventional measurements such as voltage magnitudes, bus real and reactive power injections and line real and reactive power flows. This is a nonlinear-iterative method and its solution time is considerably more than linear methods. With development of digital signal processing and global positioning systems, Phasor measurement system was introduced in last 1980s. Because of the ability of PMUs to gather synchronized phasors of voltages and currents from all over the system, they have been used in various fields of modern power systems studies such as state estimation, transient stability analysis, fault location studies, wide area protection and small signal stability (Baldwin et al., 1993; Phadke and Thorp, 2006; Kai et al., 2006; Zhao et al., 2005).
Since, PMU measures the phase and amplitude of installed bus voltages and all connected branches currents, there is no need to install PMU in all buses, thus a suitable approach is needed to determine the optimum set and locations of PMUs in the electric network.
Lots of interests have been shown toward optimal PMU placement in recent years. For first time optimal PMU placement problem is formulated using graph theoretical observability analysis (Baldwin et al., 1993). Zhao et al. (2005) dealt with the placement of a minimal set of PMUs to make system completely observable and collected more valuable dynamic data of power system at the same time using simulated annealing optimization method. PMU placement considering complete and incomplete observability is done using tree search method (Nuqui and Phadke, 2005).
Gou (2008a, b) had presented a generalized integer linear programming formulation and solution approach for PMU placement. (Chakrabarti and Kyriakides, 2008) used a exhaustive binary search method to find the minimum number of PMUs for power system complete observability.
Phasor Measurement Unit (PMU) placement for some other purposes such as voltage stability and transient stability studies were also carried out by Mili et al. (1990). The minimal PMU placement was carried out to make observable the transmission network fault location (Kai et al., 2006).
The PMU placement problem is formulated and solved using several optimization methods and algorithms such as graph theoretic procedure and Dual Search (Baldwin et al., 1993) Tabu search (Jiangnan et al., 2006), integer programming (Bei and Abur, 2004), Nondominated sorting genetic algorithm (Milosevic and Begovic, 2003), integer linear programming (Gou, 2008a, b; Dua et al., 2008). The main drawback of integer programming is that it may be trapped in local minima as mentioned by Chakrabarti and Kyriakides (2008).
Observability analysis is a fundamental component of real-time state estimation. There are two major algorithms for power network observability analysis: topology based algorithms and numerical methods. Topology methods use the decoupled measurement model and graph theory. In these methods decision is based on logical operations. Thus, they require only information about network connectivity, measurement types and their locations. If a full rank spanning tree can be constructed with current measurement set, the system will be observable.
Numerical methods, on the other hand, use either fully coupled or decoupled measurement models. These methods are based on numerical factorization of the measurement Jacobian or measurement information gain matrix. If any of these matrices is full rank, the system will be observable and there will be a unique solution for state estimation problem. Numerical methods are not suitable for large systems because they are involved with huge matrix manipulation and have their own computational complexity. Therefore, topology based method is used in this paper. It should be mentioned that OPP problem is formulated with numerical method based genetic algorithm, hitherto.
TOPOLOGY BASED FORMULATION
In this study, the optimal PMU placement problem is described as finding a scheme with minimal PMUs and their installation locations such that the entire system becomes observable. The used observability rules are as follows:
• | For PMU installed buses, voltage phasor and current phasor of all its incident branches are known. These are called as direct measurements |
• | If voltage and current phasors at one end of a branch are known then voltage phasor at the other end of the branch can be obtained. These are called pseudo measurements |
• | If voltage phasors of both ends of a branch are known then the current phasor of this branch can be obtained directly. These measurements are also called pseudo measurements |
• | For a zero-injection bus i in a N-bus system we have: |
(1) |
where, Yij is the ij-th element of admittance matrix of the system and Vj is the voltage phasor of j-th buse.
Therefore, if there is a zero-injection bus without PMU whose incident branches current phasors are all known but one, then the current phasor of the unknown one could be obtainable using KCL equations.
• | If there is a zero-injection bus with unknown voltage phasor and voltage phasors of its adjacent buses are all known, then the voltage phasor of the zero-injection node can be found by node equations |
• | If there exists a group of adjacent zero-injection buses whose voltage phasors are unknown but the voltage phasors of all adjacent buses to the group are known, then the voltage phasors of zero-injection buses can be obtained through node equations |
The measurements obtained from rules 4-6 are called extended measurements.
BRANCH AND BOUND (B AND B) APPROACH
The OPP formulation based on topological observability method that used in B and B approach is as follows:
(2) |
where, N is total No. of system buses, wi is weight factor accounting to the cost of installed PMU at bus i, X is a binary variable vector whose entries are defined as Eq. 3 and F(X) is a vector function that its entries are non-zero if the corresponding bus voltage is observable using the given measurement set and according to observability rules mentioned in earlier; otherwise its entries are zero.
(3) |
Two different methods have been proposed to take into account the zero-injection buses. These are topology transformation and nonlinear constraint functions methods. In this study, constraint functions considering adjacent zero-injection buses are constructed using a novel hybrid topology transformation-nonlinear constraint method. This method is illustrated below using an example.
In the New England 39-bus test system (Fig. 1), buses 5 and 6 are zero-injection buses. First, these two buses are combined together to make the new bus 5 with the new constraint function (topology transformation):
(4) |
Next, the new bus constraint function is eliminated from the formulation using nonlinear constraint method. Thus, the neighboring buses constraint functions are corrected as follows:
(5) |
Branch and bound is an optimization method suitable for non-convex problems and works very well for solving OPP. In this study, the problem is spitted into sub-problems (equal to the number of nodes) and for each node the upper and lower bounds are calculated using relaxation methods. Whenever the lower bound of a node becomes larger than its upper bound, that node is removed from the tree. In this case, in each step, each sub-problem is divided into two sub-trees according to fixing xi to either zero or one and a sub-tree which has the lowest lower bound is selected to continue optimization.
Fig. 1: | New England 39-bus test system |
In the next step, a variable having the value which is closest to either 0 or 1 will be selected to be fixed.
GENETIC ALGORITHM APPROACH
Genetic algorithm is one of the effective meta-heuristic methods developed in order to solve nonlinear and non-convex optimization problems. This algorithm is not dependent to objective function gradient. Besides, it has the capability of globally convergence. In order to formulate the OPP in this approach, topology of the system is shown by bus connection matrix (A). A is a N_busxN_bus symmetric binary matrix that its arrays defined as Eq. 6.
(6) |
In this method, the OPP problem is formulated as follows:
(7) |
where, yij is observability index and defined as:
(8) |
From observability rules mentioned earlier, it can be conducted that a zero injection bus is observable if all its adjacent buses be observable. Thus, to consider zero injection buses effect, a modified A matrix is developed by merging zero injection buses with one of the adjacent buses. In Fig. 2, bus-4 is zero injection bus and it merged with third bus and made bus numbered with 3.
Figure 3 shows the flowchart of OPP problem solution using genetic algorithm.
Fig. 2: | Zero injection bus merging method |
Fig. 3: | Flowchart of OPP solution using GA |
CASE STUDY RESULTS
The IEEE 14-bus, 30 -bus, 57-bus and 118-bus and the New England 39-bus test systems are used for observability analysis studies using Branch and Bound (B and B) and Genetic Algorithm (GA) approaches. Table 1 shows the data for these systems.
Optimum number of PMUs and their location using B and B approach and without considering zero injection buses information are shown in Table 2.
In Table 3, optimum PMU placement is done using GA approach and without considering zero injection buses information.
Optimum number of PMUs and their location using B and B approach and with considering zero injection buses information are shown in Table 4.
Table 1: | Test systems data |
Table 2: | Optimum number and location of PMUs using B and B approach without considering ZI buses information |
Table 3: | Optimum number and location of PMUs using GA approach without considering ZI buses information |
Table 4: | Optimum number and location of PMUs using B and B approach with considering ZI buses information |
Table 5: | Optimum number and location of PMUs using GA approach with considering ZI buses information |
Table 6: | Comparison of results of different algorithms |
N/A: Not available |
In Table 5, optimum PMU placement is done using GA approach and with considering zero injection buses information.
The results obtained using proposed approaches are compared with some other algorithms such as Tabu search (Jiangnan et al., 2006), Integer linear programming (Gou, 2008a), nondominated sorting genetic algorithm (Milosevic and Begovic, 2003), Graph theoretic procedure and Dual Search (Baldwin et al., 1993). Table 6 shows the comparison of results. In Table 6, N/A shows that the result was not available for that case.
In this study, the problem of optimum PMU placement for power system observability was investigated. The OPP problem was formulated using topology based algorithms and solved using branch and bound algorithm and genetic algorithm, proposed algorithms applied to some standard test systems.
Simulation results on the IEEE 14, 30, 57 and 118-bus test systems and the New England 39-bus test system indicate that the proposed placement methods satisfactorily provides observable system measurements with minimum number of PMUs.
The results show good improvement in decreasing the number of installed PMUs comparing with earlier applied methods.