Asian Science Citation Index is committed to provide an authoritative, trusted and significant information by the coverage of the most important and influential journals to meet the needs of the global scientific community.  
ASCI Database
308-Lasani Town,
Sargodha Road,
Faisalabad, Pakistan
Fax: +92-41-8815544
Contact Via Web
Suggest a Journal
 
Articles by A. Yahya
Total Records ( 2 ) for A. Yahya
  Z. Ismail , A. Yahya and A. Shabri
  Problem statement: Forecasting is a function in management to assist decision making. It is also described as the process of estimation in unknown future situations. In a more general term it is commonly known as prediction which refers to estimation of time series or longitudinal type data. Gold is a precious yellow commodity once used as money. It was made illegal in USA 41 years ago, but is now once again accepted as a potential currency. The demand for this commodity is on the rise. Approach: Objective of this study was to develop a forecasting model for predicting gold prices based on economic factors such as inflation, currency price movements and others. Following the melt-down of US dollars, investors are putting their money into gold because gold plays an important role as a stabilizing influence for investment portfolios. Due to the increase in demand for gold in Malaysian and other parts of the world, it is necessary to develop a model that reflects the structure and pattern of gold market and forecast movement of gold price. The most appropriate approach to the understanding of gold prices is the Multiple Linear Regression (MLR) model. MLR is a study on the relationship between a single dependent variable and one or more independent variables, as this case with gold price as the single dependent variable. The fitted model of MLR will be used to predict the future gold prices. A naive model known as "forecast-1" was considered to be a benchmark model in order to evaluate the performance of the model. Results: Many factors determine the price of gold and based on "a hunch of experts", several economic factors had been identified to have influence on the gold prices. Variables such as Commodity Research Bureau future index (CRB); USD/Euro Foreign Exchange Rate (EUROUSD); Inflation rate (INF); Money Supply (M1); New York Stock Exchange (NYSE); Standard and Poor 500 (SPX); Treasury Bill (T-BILL) and US Dollar index (USDX) were considered to have influence on the prices. Parameter estimations for the MLR were carried out using Statistical Packages for Social Science package (SPSS) with Mean Square Error (MSE) as the fitness function to determine the forecast accuracy. Conclusion: Two models were considered. The first model considered all possible independent variables. The model appeared to be useful for predicting the price of gold with 85.2% of sample variations in monthly gold prices explained by the model. The second model considered the following four independent variables the (CRB lagged one), (EUROUSD lagged one), (INF lagged two) and (M1 lagged two) to be significant. In terms of prediction, the second model achieved high level of predictive accuracy. The amount of variance explained was about 70% and the regression coefficients also provide a means of assessing the relative importance of individual variables in the overall prediction of gold price.
  Z. Ismail , A. Yahya and K.A. Mahpol
  Problem statement: Forecasting of electricity load demand is an essential activity and an important function in power system planning and development. It is a prerequisite to power system expansion planning as the world of electricity is dominated by substantial lead times between decision making and its implementation. The importance of demand forecasting needs to be emphasized at all level as the consequences of under or over forecasting the demand are serious and will affect all stakeholders in the electricity supply industry. Approach: If under estimated, the result is serious since plant installation cannot easily be advanced, this will affect the economy, business, loss of time and image. If over estimated, the financial penalty for excess capacity (i.e., over-estimated and wasting of resources). Therefore this study aimed to develop new forecasting model for forecasting electricity load demand which will minimize the error of forecasting. In this study, we explored the development of rule-based method for forecasting electricity peak load demand. The rule-based system synergized human reasoning style of fuzzy systems through the use of set of rules consisting of IF-THEN approximators with the learning and connectionist structure. Prior to the implementation of rule-based models, SARIMAT model and Regression time series were used. Results: Modification of the basic regression model and modeled it using Box-Jenkins auto regressive error had produced a satisfactory and adequate model with 2.41% forecasting error. With rule-based based forecasting, one can apply forecaster expertise and domain knowledge that is appropriate to the conditions of time series. Conclusion: This study showed a significant improvement in forecast accuracy when compared with the traditional time series model. Good domain knowledge of the experts had contributed to the increase in forecast accuracy. In general, the improvement will depend on the conditions of the data, the knowledge development and validation. The rule-based forecasting procedure offered many promises and we hoped this study can become a starting point for further research in this field.
 
 
 
Copyright   |   Desclaimer   |    Privacy Policy   |   Browsers   |   Accessibility