Subscribe Now Subscribe Today
Science Alert
 
Blue
   
Curve Top
Information Technology Journal
  Year: 2012 | Volume: 11 | Issue: 8 | Page No.: 1070-1076
DOI: 10.3923/itj.2012.1070.1076
 
Facebook Twitter Digg Reddit Linkedin StumbleUpon E-mail

Constraints Based Equipment Scheduling for Innovation Talent Cultivation in Chinese IT Undergraduate Education

Bin Xu, Yun Ling, Yujia Ge, Jie Chen and Zhixian Chen

Abstract:
Innovation talent is very important when working for information technology. Innovation talent cultivation is regarded as the first priority program during the Information Technology (IT) undergraduate education in Chinese universities. However, such program couldn’t cover all the undergraduates all the time due to the insufficient equipment, instructors and investment. This study clarified the instructors, undergraduates, equipment and talent cultivation program with E-CARGO collaborative model and proposed an equipment scheduling algorithm based on the constraints. Algorithms are presented to identify the lack of equipment and optimize the equipment on demand. The results from the practice show that the suggested approach is objective and efficient.
PDF Fulltext XML References Citation Report Citation
 RELATED ARTICLES:
  •    Instructional Designs in Quantum Physics: A Critical Review of Research
  •    A Preliminary Correctness Evaluation Model of Object-Oriented Software Based on UML
  •    An Integration Customer-Driven Requirement-Refining Scheme of Business Process Reengineering
  •    Information Technology for Management and Decision Supports Systems
How to cite this article:

Bin Xu, Yun Ling, Yujia Ge, Jie Chen and Zhixian Chen, 2012. Constraints Based Equipment Scheduling for Innovation Talent Cultivation in Chinese IT Undergraduate Education. Information Technology Journal, 11: 1070-1076.

DOI: 10.3923/itj.2012.1070.1076

URL: https://scialert.net/abstract/?doi=itj.2012.1070.1076

COMMENT ON THIS PAPER
 
 
 

 

 
 
 
 
 
 
 
 
 

 
 
 
 
 

Curve Bottom