Abstract: In this study, for coordination of production and distribution scheduling in the implementation of a supply chain solution, we studied the problem of synchronized scheduling of single machine and air transportation in supply chain management. The overall problem is decomposed into two sub-problems, which consists of air transportation allocation problem and a single machine scheduling problem which they are considered together. We have taken into consideration different constraints and assumptions in our modeling such as due window, delivery tardiness and no delivery tardiness. For these purposes, mathematical models have been proposed to minimize supply chain total cost which encompasses transportation, makespan, delivery earliness tardiness and departure time earliness tardiness costs.