Risk Control in Lump-sum Contracting Projects of Electric Power Companies

Hongming Chen and Lili Zeng

Abstract:
The lump-sum contracting mode of electric power projects is domestically in the rise. The mode is a risky business which all kinds of risk run throughout the project. Recognizing as well as controlling risk timely which improves the ability to resist risks dramatically decides the institute and its subordinates whether can remain invincible in fierce competition. This paper aims at the study of perfecting procession about forecasting and preventing the controllable risk of electric power company. The management includes stages of contracting, designing, construction, trial operation, acceptance, assurance of quality, financial risk procurement and subcontracting.
PDF References Citation Report Citation
How to cite this article:

Hongming Chen and Lili Zeng, 2013. Risk Control in Lump-sum Contracting Projects of Electric Power Companies. Journal of Applied Sciences, 13: 3350-3353.

DOI: 10.3923/jas.2013.3350.3353

URL: https://scialert.net/abstract/?doi=jas.2013.3350.3353

COMMENT ON THIS PAPER
 
 
 

 

 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 

Curve Bottom