Subscribe Now Subscribe Today
Science Alert
 
Blue
   
Curve Top
Journal of Applied Sciences
  Year: 2011 | Volume: 11 | Issue: 9 | Page No.: 1580-1586
DOI: 10.3923/jas.2011.1580.1586
 
Facebook Twitter Digg Reddit Linkedin StumbleUpon E-mail

Performance Improvement through an Asset Maintenance Optimisation System

Brian J. Cane CEng FIMMM

Abstract:
There are a variety of factors that can influence the performance of plant assets. These include the design and the operating mode, but one of the most influential factors is the effectiveness of maintenance programmes. Best practice operators generally spend less on maintenance but still avail of good operational performance. The first step in any improvement program is to benchmark the current status of the plant in terms of its operation and maintenance process effectiveness. Once this has been established, programmes can be developed to address any skills or procedural deficiencies. This is followed by an assessment of plant condition related risks to safety and availability. Two distinct phases are thus involved in an Asset Maintenance Optimisation System (AMOS). The first phase is a performance benchmarking exercise and management processes review involving historical performance relative to industry norms and integrity management programme and programme implementation audits. The second phase involves comprehensive plant-wide implementation of risk-based inspection and maintenance (RBI) planning tools which output risks, safe run lengths and inspection plans at equipment level. The study describes the processes involved in Phase 1 and Phase 2. Examples of implementation are illustrated using TWI’s RISKWISE software for process units, utilities plant and pipelines.
PDF Fulltext XML References Citation Report Citation
How to cite this article:

Brian J. Cane CEng FIMMM , 2011. Performance Improvement through an Asset Maintenance Optimisation System. Journal of Applied Sciences, 11: 1580-1586.

DOI: 10.3923/jas.2011.1580.1586

URL: https://scialert.net/abstract/?doi=jas.2011.1580.1586

COMMENT ON THIS PAPER
 
 
 

 

 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 

Curve Bottom