Subscribe Now Subscribe Today
Science Alert
 
Blue
   
Curve Top
Journal of Applied Sciences
  Year: 2008 | Volume: 8 | Issue: 5 | Page No.: 836-841
DOI: 10.3923/jas.2008.836.841
 
Facebook Twitter Digg Reddit Linkedin StumbleUpon E-mail

Optimum Production Control and Workforce Scheduling of Machining Project

Tian- Syung Lan, Chih- Yao Lo and Cheng- I Hou

Abstract:
Through the proposed model in this study, the production control with the consideration of workforce scheduling for advanced manufacturing systems becomes realistically and concretely solvable. This study not only meditates the concept of balancing machine productivity and human ability into the objective, but also implements Calculus of Variations to optimize the profit for a deterministic production quantity. In addition, the optimum solutions of dynamic productivity control and workforce scheduling are comprehensively provided. Moreover, the decision criteria for selecting the optimum solution and the sensitivity analysis of the critical variables are fully discussed. This study definitely contributes the applicable strategy to control the productivity and workforce in manufacturing and provides the valuable tool to conclusively optimize the profit of a machining project for operations research in today`s manufacturing industry with profound insight.
PDF Fulltext XML References Citation Report Citation
 RELATED ARTICLES:
  •    Optimal Design of Petroleum Refinery Topology using a Discrete Optimization Approach with Logical Constraints
  •    Improving Oil Refinery Productivity through Enhanced Crude Blending using Linear Programming Modeling
How to cite this article:

Tian- Syung Lan, Chih- Yao Lo and Cheng- I Hou, 2008. Optimum Production Control and Workforce Scheduling of Machining Project. Journal of Applied Sciences, 8: 836-841.

DOI: 10.3923/jas.2008.836.841

URL: https://scialert.net/abstract/?doi=jas.2008.836.841

COMMENT ON THIS PAPER
 
 
 

 

 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 

Curve Bottom