Subscribe Now Subscribe Today
Science Alert
 
FOLLOW US:     Facebook     Twitter
Blue
   
Curve Top
Information Technology Journal
  Year: 2013 | Volume: 12 | Issue: 3 | Page No.: 498-501
DOI: 10.3923/itj.2013.498.501
 
Facebook Twitter Digg Reddit Linkedin StumbleUpon E-mail
Production Management Modelling of Ship Repair Process Based on MAS
Li He, Xuewen Huang and Xiaobing Liu

Abstract:
The current situation of ship-repair enterprises was described in this paper. Aiming at the current production management and process of ship-repair enterprises, the modelling based on Multi-Agent System (MAS) was built. It can transmit the information instantly via Order Agent (OA), Manager Agent (MA), Production Agent (PA), Quotation Agent (QA) and Inspection Agent (IA) and realize information sharing. It can realize the integration of data stream, business flow and fund flow.
PDF Fulltext XML References Citation Report Citation
How to cite this article:

Li He, Xuewen Huang and Xiaobing Liu, 2013. Production Management Modelling of Ship Repair Process Based on MAS. Information Technology Journal, 12: 498-501.

DOI: 10.3923/itj.2013.498.501

URL: https://scialert.net/abstract/?doi=itj.2013.498.501

 
COMMENT ON THIS PAPER
 
 
 

 

 
 
 
 
 
 
 
 
 

 
 
 
 
 

       

       

Curve Bottom