INTRODUCTION
Wind as a source of electrical energy is growing in popularity across the globe
(Babainejad and Keypour, 2010; Abdelaziz
et al., 2011; Yasin et al., 2011;
Yu et al., 2012). However, its development and
utilization in developing countries, particularly Africa, has been hindered
by absence of adequate measurements and/or assessment studies to ascertain its
potential viability for power generation (Ajayi et al.,
2011a). This according to Ajayi et al. (2011a)
has hindered national and international wind energy investors from embarking
on wind energy technology development and establish wind farms across the countries.
Moreover, generating electricity from wind requires the first step of detailed
and rigorous resource assessment. This is done to ascertain the magnitude of
potential and the viability of developing a wind farm in the site/location of
interest. Further to this, the result of complete assessment study can aid in
the selection of appropriate turbine model for a site. It can also be employed
for determining the sites wind profile characteristics and economic benefits
of generating wind electricity from the site (Ajayi et
al., 2011b). It is worthy of note that, before embarking on wind energy
investments, the investor would first like to know where a certain wind speed
is possible and what would be the corresponding energy output from such speed.
Moreover, various models exist for analyzing wind speed data for power generation.
Some of those that have been used in time past range from using standard parametric
distributions to distributions that relate to applying the principle of maximum
entropy. Some authors have also suggested the use of univariate and bivariate
distributions, unimodal, bimodal, bitangential and hybrid distributions (Justus,
1978; De Auwera et al., 1980; Koeppl,
1982; Ozerdem and Turkeli, 2003; Shata
and Hanitsch, 2006; Penelope and Carta, 2006; Akpinar
and Akpina, 2007; Tar, 2008; Chang
and Tu, 2007; Shamilov et al., 2008; Carta
et al., 2009). In the recent past, better statistical models have
surfaced. These include the gamma distribution function of two parameters, normal
and lognormal, Rayleigh and Weibull statistical distributions (Ozerdem
and Turkeli, 2003; Akpinar and Akpina, 2007; Ngala
et al., 2007; Carta et al., 2009).
According to Carta et al. (2009), the Rayleigh
distribution function of one parameter corresponds to the chi distribution for
two degrees of freedom and also coincides with the two parameter Weibull distribution
when the shape parameter (k) of the latter takes the value 2. Moreover, the
Weibull distribution technique has enjoyed more emphasis. It has been employed
in various regions of the world fundamentally to evaluate wind energy potential
and carry out the complete statistical analyses of wind characteristics (Akpinar
and Akpinar, 2005a, b; Fadare,
2008; Yang et al., 2008; Carta
et al., 2009; Kamau et al., 2010;
Fagbenle et al., 2011; Ajayi
et al., 2011a, b). Further to this, the Weibull
two-parameter distribution (scale (c) and shape (k) parameters) has also always
provided results with the best goodness-of-fit and statistical significance
(Burton et al., 2001; Akpinar
and Akpinar, 2005a, b; Kwon,
2010).
However, the use of these models, especially the Rayleigh and Weibull distributions involve the utilization of a set of wind speed data covering some period for statistical significance. Based on this, some investors may be unwilling to commit resources to embark on this task since they are not sure of the outcome. This therefore creates a need for the development of an empirical model that can be used as a first stop before complete assessment study. Such model when available will aid in site selection. In addition, although such pre-assessment model may not give accurate results but could lead to the determination of the likely potential of wind energy harvest of a site/location. This is the focus of this study. It aims to use existing equations to develop a better but simple model representation that is suitable for evaluating the likelihood potential of a site. The result from this model will serve as a pointer to determining the likelihood of generating what magnitude of wind electricity (either gigawatt-hour (GWh), megawatt-hour (MWh) or kilowatt-hour (kWh)).
MATERIALS AND METHODS
A complete assessment study begins with site selection and preparation, followed by installation of wind speed measuring equipment. In order to have adequate measurement and statistically significant analysis, wind speed measurements covering some years are always required. This is done in order to capture the associated fluctuations of wind speeds across a location. Figure 1 presents a flowchart showing the steps to complete resource assessment and decision making. The analysis and modelling stage is critical to the study as it exposes the sites potential and determines the degree of viability of wind-to-power project at the site.
Moreover, for the purpose of this study, monthly mean wind speeds at 10 m height
covering 21 years (1987 to 2007) were obtained from the Nigerian meteorological
department, Oshodi, Lagos State, Nigeria. The data are statistically presented
using Fig. 2 to 10 for both monthly and
annual distributions. The distributions of Fig. 2 and 3
were obtained by evaluating the 21 years arithmetic mean of the wind data
across the months and years. Those of Fig. 4 to 8
were obtained by determining the periods lowest and highest mean wind
speed values of the data lot across each month.
|
| Fig. 1: |
Step by step procedure for carrying out complete resource
assessment study |
|
| Fig. 2: |
Twenty one years monthly average wind speed profiles
for all the stations |
| Table 1: |
Details of the stations for which wind data were assessed |
 |
Figure 9 and 10 on the other hand is used
to represent the range of data spread across the period of months and years.
The information regarding the stations location of which the wind speed
data were employed is presented in Table 1.
|
| Fig. 3: |
Twenty one years annual average wind speed profiles
for all the stations |
|
| Fig. 4: |
Wind profiles showing monthly mean wind speed range for stations
in Lagos state |
|
| Fig. 5: |
Wind profiles showing monthly mean wind speed range for stations
in Ogun state |
Modelling procedure
Wind power: The average power extractable from the wind by a wind
turbine has been established to vary with the cube of the average wind speed
of a local site. This is given mathematically as:
| Where: |
| P |
= |
Power flux |
| ρ |
= |
Air density |
| vi |
= |
Wind speeds |
| Cp |
= |
Coefficient of power |
| x |
= |
Number of data points |
| A |
= |
Wind turbine rotor area |
|
| Fig. 6: |
Wind profiles showing monthly mean wind speed range for stations
in Ondo state |
|
| Fig. 7: |
Wind profiles showing monthly mean wind speed range for stations
in Oyo state |
|
| Fig. 8: |
Wind profiles showing average monthly mean wind speed range
for stations in Osun state |
Wind power evaluated from the Weibull statistics is derived from Akpinar
and Akpinar (2005a, b) and Fagbenle
et al. (2011):
where, p (v) is wind power from Weibull distribution, c and k are the Weibull scale and shape parameters, respectively.
|
| Fig. 9: |
Twenty one years monthly average wind speed range for
each of the stations |
|
| Fig. 10: |
Twenty one years annual average wind speed range for
each of the stations |
The Weibull mean wind speed and standard deviation are generated from Ajayi
et al. (2011a):
where, Γ ( ) is the gamma function of ( ).
Estimation of the performance of the Weibull statistics: To deduce the
degree of convergence of the Weibull results to the actual measured wind speed
values (vactua) led to employing statistical analyses based on the
coefficient of determination, R2, the Root Mean Square Error (RMSE)
and the Nash-Sutcliffe model Coefficient of Efficiency (COE) (Ajayi
et al., 2011a). These are given by:
Wind energy per unit area: The average wind energy extractable from the wind by a wind turbine is obtained from the average power by:
| Where: |
| η |
= |
Turbine efficiency |
| Ti |
= |
Mean period |
Moreover, the mean period, Ti, is given by the Rayleigh probability
distribution model as:
where, Tmax is maximum time period for a year in hours = 8760 h.
Substituting Eq. 9 into 8 gives:
where, Eave is Average wind energy flux density.
Equation 10 is therefore, the general expression for annual
wind energy flux density in Wh/m2 year.
From Eq. 10, it is clear that:
Thus a regression of E against vm for different values of vm for a particular location gives the wind energy per unit area for the location. Furthermore, the outcome of the regression analysis can also give the constitutive relationship between wind energy and mean speed.
Modelling wind energy potential of the sites and zone: From Eq. 10, it is noted that the values of E will be determined, apart from those of the mean wind speeds, by the values of η and Cp. Thus assuming Cp = 1 and varying η within the range 0.15≤η≤1 for Ikeja station for instance gives Table 2.
A regression analysis of E against vm of Table 2 gives Fig. 11 for the different values of η. Figure 11 reveal that, as the values of η increase, the values of the harvested wind energy increased. Also observed from Fig. 11 is the changing value of the coefficient of v with those of η. Thus it can be deduced from Fig. 11 that:
| Table 2: |
The values of wind energy per unit area corresponding to
various values of turbine efficiency for Ikeja station |
 |
In order to establish the exact relationship of Eq. 12 and
13 led to Fig. 12. Figure
12 therefore, demonstrates that Eq. 12 can be re-written
as:
Moreover, varying the values of CP, as was done for η and the number of stations (n) from 1 to as many gave Eq. 15 as:
Equation 15 is therefore, the constitutive wind energy model
which is suitable for analyzing wind energy situation of Ikeja station.
|
| Fig. 12: |
Regression of variation of coefficient of speed with the turbine
efficiency |
Repeating the procedure for the other stations gave Eq. 16
to 25:
The R2 values that relates to the models all lie within 0.998≤R2≤1.000.
To determine the magnitude of E for the entire zone, the arithmetic mean of the annual wind speeds of all stations within the zone was employed. This gave:
RESULTS AND DISCUSSION
Wind profile characteristics of the stations/sites: Figure
2 and 3 presents the 21 years monthly and annual
average wind speed distributions across the stations/sites in the zone. While
Fig. 2 and 3 reveal fluctuations in magnitude
of the wind profiles across the stations, Fig. 2 shows fairly
stable distributions with Abeokuta the most stable of the profiles. Observation
of Fig. 2 and 4 to 8 reveal
that the period of highest potential for wind energy harvest lie within February
to July and that for lowest yield is within September to November across the
zone with only few exceptions.
Ranking the sites/stations according to the monthly variations of the magnitudes
of their average wind speed profiles (Fig. 9) gave Lagos Island
as the best site followed closely by Ikeja, Shaki, Iseyin, Ibadan and Marina
in order. The stations in Abeokuta and Ondo experienced the least magnitudes
of wind profiles across the period. Figure 10 presents the
ranking according to the range of annual average wind speeds. This also shows
Lagos Island as the best, followed by Ikeja. Abeokuta and Ondo are the least.
Based on state by state analysis, the state with more than one stations are
shown in Fig. 4 to 7. Ranking the sites
in each state in terms of good wind energy potential presents Lagos Island and
Ikeja in Lagos state, Akure in Ondo state, Ijebu Ode in Ogun state and, Shaki
and Iseyin in Oyo state.
Average range of wind energy potential at a local site: Equations
15 to 25 gives the magnitude of wind energy per unit
area that can be generated from each of the sites studied. The obtained values
of R2 reveal that the models of Eq. 15 to 25
are adequate to explain the changes in the magnitudes of wind energy per unit
area of the different stations. Based on this, there is however a need to develop
a model which will be suitable to determine the range of wind energy potential
of any site from any location within the zone. With such model, it will be very
easy to estimate the range of average wind energy that can be harvested based
on the value of wind speed from any site within the zone. Thus, to develop this
model, the statistical tolerance limit method was employed with Eq.
15 to 25. The result is given as:
Going by Eq. 27, the magnitude of average wind energy per unit area that could be generated from any station in the analysis range between 8474.97ηxCpxv2.518 and 12621.80ηxCpxv2.848.
For instance, in each of the stations with the average annual wind speeds, the magnitude of wind energy that can be produced from an ideal wind turbine (with the assumption that (ζ = Cpxη = 1)) is given in Table 3.
Table 3 clearly demonstrates that the results from Eq.
15 to 25 fall within the range of Eq.
27. This means that, Eq. 27 is a better model representation
for the whole of the zone. Thus the knowledge of the average wind speed of any
site within the zone can lead to determining the range of average energy flux
density harvestable from the location. However, since investors are always interested
in the optimum value of wind harvest, the optimum value of the wind energy that
can be harvested from a site, based on the magnitude of the mean wind speed
is given as:
Equation 28 is therefore, a useful model for estimating
the maximum likelihood of wind energy flux density harvestable from any site
within the zone.
Performance evaluation of the model represented by Eq. 28:
Since the Eq. 27 is found to be suitable for all sites within
the studied zone, it became necessary to carry out an accuracy check on the
model.
| Table 4: |
Weibull results and the percentage difference between the
Weibull results and the optimum value-result of Eq. 22 |
 |
| Table 5: |
Comparing results from using Eq. 22 with
those of other published reports |
 |
This is to determine its level of accuracy. In order to do this, the 2-parameter
Weibull statistical distribution was fitted to the annual average wind speed
distribution of the stations. The results from the Weibull analysis were then
compared with those obtained for the optimum value of Eq. 28.
Table 4 presents the outcome of these analyses. Table
4 shows that the values of the Eop are able to predict between
54 and approximately 100% of the values of EWeibull. In addition,
the results of Eop reveal that it is possible to generate more than
1 MWh/m2 year of wind electricity from Ikeja and Lagos Island. It
also shows the possibility of wind electricity production of other sites. Furthermore,
it reveals that Abeokuta and Ondo stations are not very adequate for large scale
wind power project due to the low values. Thus, with the knowledge of a single
wind speed from a site, it is possible to have an instant evaluation of the
probability of the sites suitability.
Further from Table 4, it shows that the values of the Weibull
2-parameters fall within the range 2.07≤k≤4.95 and 2.21≤c≤5.63,
respectively. The high values of k and c (k≥2.0 and c≥2.0) indicates that
the data spread exhibited good uniformity with relatively small scatter and
that the Weibull mean wind speed results were very close to the actual value
(Ajayi et al., 2011b). Further to this, the Weibull
estimation results of R2, RMSE and COE show that the Weibull distribution
is adequate at explaining the situation of wind profiles at the sites. Thus
comparing the Weibull results with those from Eq. 28 is worthwhile.
It is also worth noting that the model of Eq. 28 can be internationalized
for preliminary site study provided the wind distribution of the location is
similar to those of this study.
When the model was tested with other published reports (Akpinar
and Akpinar, 2005a; Kamau et al., 2010; Keyhani
et al., 2010), it gave Table 5. Akpinar
and Akpinar (2005a) carried out the statistical analysis of the wind speed
data of Keban-Elazig, Turkey. Kamau et al. (2010)
on the other hand studied the 6 years wind data for Marsabit Kenya, while Keyhani
et al. (2010) carried out the assessment of wind energy potential
for power generation of Tehran, Iran. The studies employed the 2-parameter Weibull
statistical distribution for the analyses. Table 5 therefore
showed that the model represented by Eq. 28 can be used as
a preliminary check to predict the likely potential of wind energy harvestable
from a site before embarking on detailed assessment study of such site.
Application of wind turbine parameters: The analyses carried out above were done on the basis of an ideal turbine (i.e., assuming 100% efficiency). However, an actual turbine cannot extract more than 59.3% (according to Betz law) of the power in an undisturbed tube of air of the same area. In practice, the fraction of power extracted will always be less because of mechanical imperfections. These mechanical imperfections and also factors due to shape and size of rotors as well as the fluctuations of the wind speeds will lead to a further decline in the efficiency of a practical wind turbine. Thus to determine the likely magnitude of wind power harvestable from a practical wind turbine will require inputting the turbine parameters of Cp and η into Eq. 28.
CONCLUSION
The study has been used to develop a theoretical model for preliminary study of the wind speed potential for energy production. It made use of 21 years (1987-2007) monthly mean speeds for 11 stations from the south-west geopolitical zone of Nigeria. The outcome of analyses led to the development of a model which can be used for preliminary evaluation of the likelihood of a sites capacity for wind energy generation. The optimum wind energy model developed is given as: Eop = 12621.80xηxCpxv2.848. It is thought that, although the model was developed using data from Nigeria, it could be employed for such preliminary analysis of any site around the world, especially those with wind profile distributions similar to those of this study. The purpose of the model was to serve as a tool for preliminary prediction of the likelihood of developing a site for wind farm purposes. The basic input of the model is the wind speed of the site. Based on the result from the model, a decision can be taken on the possibility of carrying out a detail site assessment study. This will involve measuring the sites wind speed over a period of time and years, before determining the sites potential by Weibull or any other statistical means.